| 1 | Structural Engineering and Safety | 20% | Documented design calculations for wind load, snow load, dead load, drainage, anchoring, and connection strength. Designs must be checked against the project’s applicable local building code. | Stamped engineering drawings, load calculations, material specifications, and project-specific structural documentation. | 20 |
| 2 | Aluminum Profile and Finish Quality | 15% | Traceable aluminum alloy and temper information, profile dimensional consistency, coating or anodizing specification, surface uniformity, and corrosion-resistance requirements. | Mill certificates, profile drawings, coating specifications, inspection reports, and representative production samples. | 15 |
| 3 | Weatherproofing and Thermal Performance | 15% | Air infiltration, water penetration, wind-pressure resistance, condensation control, glazing specification, thermal breaks, gaskets, sealants, and roof drainage design. | Test reports based on applicable methods such as ASTM E283, ASTM E331, ASTM E330, EN 1027, EN 12208, or equivalent regional standards. | 15 |
| 4 | Quality Management System | 15% | Documented incoming-material inspection, in-process inspection, final inspection, nonconformance control, corrective actions, and product traceability. | Valid ISO 9001 certificate where applicable, quality manuals, inspection checklists, calibration records, and batch-traceability documents. | 15 |
| 5 | Glass, Roof, and Hardware Specification | 10% | Safety-glass configuration, insulating-glass construction where required, roof-panel performance, hardware load rating, drainage hardware, and replacement-part availability. | Glass certificates, component datasheets, hardware specifications, installation manuals, and spare-parts lists. | 10 |
| 6 | Manufacturing Capability and Capacity | 10% | Availability of cutting, CNC machining, drilling, assembly, glazing, packaging, and final-inspection processes, supported by measurable production planning. | Factory audit records, equipment lists, process-flow charts, production schedules, and sample inspection records. | 10 |
| 7 | Customization and Technical Support | 5% | Ability to provide site-specific drawings, unusual dimensions, roof configurations, ventilation options, drainage details, and installation guidance. | Technical submittals, shop drawings, revision records, installation manuals, and documented pre-sales engineering support. | 5 |
| 8 | Export Documentation and Packaging | 5% | Accuracy of commercial invoices, packing lists, installation documents, product labels, container loading plans, and protection against transport damage. | Redacted shipping documents, packaging specifications, loading photographs, handling instructions, and export compliance procedures. | 5 |
| 9 | Delivery Reliability and Project Control | 3% | Clarity of quotation validity, production milestones, inspection timing, change-order control, shipment scheduling, and documented issue resolution. | Anonymized order records, production milestone reports, inspection schedules, and corrective-action records. | 3 |
| 10 | Warranty and After-Sales Service | 2% | Clarity of warranty coverage, exclusions, response procedures, replacement-part support, installation assistance, and defect-resolution timelines. | Written warranty terms, service procedures, spare-parts policy, complaint logs with confidential information removed, and service-response records. | 2 |